Feedbacks needing attention
How to find the feedbacks that are late to be instructed or completed, and catch up on each before the donor has to ask.
Pas encore traduite
Keeping your promises to donors on time means knowing which feedbacks have fallen behind. A feedback is overdue once the date it should be instructed by, or the date it should be completed by, has passed, as Due dates explains. Feedbacks Needing Attention brings every overdue feedback together, so the people who look after your projects can see what's late and catch up before a donor has to ask.
Working through the list
Each row shows the feedback's reference and scheme, the account, and Overdue For: whether it's overdue for Instruction, Completion or both, with the date each was due and how many days overdue it is. The row also shows the feedback's status, and the project it's assigned to, or "Not instructed" if it hasn't been instructed yet. The most overdue feedback is first. Select Overdue For to put the most recently due first instead.
To narrow the list, type a reference or a name in the search box, or use the filters above it, then select Search:
- Scheme Details finds feedbacks by scheme, by the values of your fund dimensions, or by part of a project's location, name or code.
- Feedback Details narrows the list, under Overdue For, to the feedbacks overdue for Instruction, or to those overdue for Completion.
Reset All clears every filter, and Load More, below the list, shows the next feedbacks.
Fixing each one
Select a feedback's reference, or the icon at the end of its row, which says View when you point at it, to open the feedback. A feedback overdue for instruction is waiting to be instructed in Reach. One overdue for completion is waiting for the work to be done, or for its reports to be approved, as the Feedbacks overview explains. If the original date no longer makes sense, move it, as Changing a feedback shows. A feedback leaves the list once it's no longer overdue.